Skip to content
Telephone 01224 502050 Email info@bankheadelectrical.co.uk

When is my next inspection due?

Enter your last EICR, Ex inspection or PAT date to see when the next one is due, and get a reminder before it is due.

The intervals are published maximums or starting points (shown under the result). Your last report, insurer or a risk assessment can set a shorter one.

Inspection intervals

How often does a commercial EICR need doing?

IET Guidance Note 3 recommends a maximum of 5 years for offices, shops, schools and hotels, 3 years for industrial premises and places of public entertainment, and 1 year for leisure centres, swimming pools and petrol stations. The interval on your last report takes priority when it is shorter.

How often do hazardous area (Ex) installations need inspecting?

IEC 60079-17 sets periodic inspections of fixed installations at intervals not exceeding 3 years, unless a documented assessment by a competent person justifies a different interval. Mobile and transportable Ex equipment, such as wireline units and skids, is inspected every 12 months. The grade (detailed, close or visual) and any sample inspections in between are set by the site's inspection strategy.

How often should portable appliances be tested?

The IET Code of Practice gives starting points by type of premises and equipment: from every 3 months on construction sites to every 2 years for Class I equipment in offices. Your own risk assessment can shorten or lengthen them.