Skip to content
Telephone 01224 502050 Email info@bankheadelectrical.co.uk

Water and wastewater electrical contractor

MCC and control panel builds, site installation and maintenance for treatment works and pumping stations.

Treatment works run on motors, pumps and control systems that cannot be switched off for long. Our combination of an in-house panel shop and site electricians means one team handles the panel, the installation and the commissioning.

What we do for water utilities and their contractors

  • Motor control centre design and build to BS EN 61439-2
  • Control panel replacement and upgrades with planned changeover windows
  • Site installation, containment, cabling and termination
  • Instrumentation and control wiring
  • Inspection, testing and certification
  • Planned and reactive maintenance

Relevant services

Frequently asked questions

Do you build motor control centres?

Yes. MCCs and control panels are designed, built and tested in our workshop to BS EN 61439-2, then installed and commissioned on site by our own electricians.

Can you work on live treatment sites?

Yes. We plan changeovers around plant demand and permit systems so that treatment is not interrupted.